Building a 10 marla double-storey house of about 4,000 sq ft in Islamabad or Rawalpindi costs PKR 1.12 to 1.56 crore for the grey structure in 2026, and PKR 2.4 to 4.6 crore for a complete house with a standard to premium finish. An A category finish can take it above PKR 6 crore.

10 marla is the most common plot size we build on in the twin cities. This guide breaks down what a 10 marla house costs at our 2026 rates, what drives the number up or down, and how long it takes. All figures are for material and labour, based on covered area.

10 marla house cost by finish level, 2026

PackageRate per sq ft4,000 sq ft house
Grey structurePKR 2,800 to 3,900PKR 1.12 to 1.56 crore
Turnkey, standard finishPKR 6,000 to 8,500PKR 2.4 to 3.4 crore
Turnkey, premium finishPKR 8,500 to 11,500PKR 3.4 to 4.6 crore
Turnkey, A categoryPKR 11,500 to 15,000+PKR 4.6 to 6 crore+

How big is a 10 marla house?

A 10 marla plot is usually 35 by 70 ft in Islamabad sectors and many societies. After setbacks for the front lawn, car porch and back space, a double-storey house with a mumty typically has about 3,800 to 4,200 sq ft of covered area. A single-storey house is around 2,000 to 2,300 sq ft, and a basement adds another 1,500 to 2,000 sq ft.

Where the money goes

Part of the buildShare of a turnkey budget
Grey structure (frame, walls, slabs, plaster, services in walls)About 40 to 45 percent
Flooring, tiles and marbleAbout 10 to 15 percent
Doors, windows, kitchen and wardrobesAbout 15 to 20 percent
Bathrooms, electrical and plumbing fittingsAbout 10 to 15 percent
Paint, ceilings, gate and external worksAbout 10 percent

The split shifts with your choices. Imported sanitary fittings, solid wood doors and false ceilings move money into finishing; a basement moves it into the structure. Current cement and steel rates drive most of the grey structure figure.

What pushes the cost up or down

  • Single or double unit: two kitchens and separate lounges add finishing cost.
  • Basement: excavation, retaining walls and waterproofing add roughly PKR 50 lakh or more.
  • Design: double-height entrances, cantilevers and big glass need more steel and labour.
  • Brands: local versus imported tiles, sanitary ware and fittings is the biggest swing in finishing.
  • Society: approval fees, access and site rules differ between DHA, Bahria Town and the CDA sectors.

How long does a 10 marla house take?

About 4 to 5 months for the grey structure and 10 to 12 months for a complete turnkey house, counted from approved drawings. A basement adds 1 to 2 months. Stop-start projects, usually caused by delayed payments or late design decisions, take longer and cost more.

Costs not included in the per sq ft rate

  • Map approval and authority fees
  • Electricity, gas and water connections
  • Solar, generators and smart home systems
  • Furniture, curtains and appliances

Get your own figure

Every 10 marla house is different. Use the calculator on our construction cost guide for your covered area, or book a free site visit and we will give you a written BOQ with quantities and brands.

10 marla house cost questions

How much does it cost to build a 10 marla house in Islamabad in 2026?

About PKR 1.12 to 1.56 crore for the grey structure and PKR 2.4 to 4.6 crore turnkey with a standard to premium finish, for a double-storey house of around 4,000 sq ft.

What is the covered area of a 10 marla double-storey house?

Typically about 3,800 to 4,200 sq ft including the mumty, depending on design and society bye-laws.

What is the cheapest way to build a 10 marla house?

Keep the design simple, skip the basement, choose standard local finishes and keep work continuous. A simple double-storey layout with a standard finish stays near PKR 2.4 crore.

How long does it take to build a 10 marla house?

About 4 to 5 months for grey structure and 10 to 12 months for a complete turnkey house, from approved drawings.

Does a basement add a lot to the cost?

Yes. Excavation, retaining walls and waterproofing usually add PKR 50 lakh or more to a 10 marla house.