PKR 2,800 to 3,900 per sq ft in 2026, material and labour included. Engineer-checked RCC frame, a written BOQ, and a 10 marla structure in 4 to 5 months.

Get my free estimateWhatsApp +92 331 8834468

  • Written BOQ
  • Engineer on site
  • 1-year warranty

Estimate your grey structure construction cost

Estimated costPKR
Get exact quote on WhatsApp

Indicative only. Or book a free site visit for a written BOQ

In short

We build grey structures for PKR 2,800 to 3,900 per sq ft in 2026, with material and labour. That covers the foundation, RCC frame, brick walls, roof slabs, plaster and the pipes and conduits inside the walls. A 10 marla house takes about 4 to 5 months, and every pour is checked by our engineer.

What grey structure means

The skeleton of your house, built to last a lifetime

Grey structure is everything that holds your house up and keeps the weather out: foundation, RCC columns and beams, roof slabs, brick walls, plaster and the hidden pipes and conduits inside them. It is about 40 to 45 percent of the total cost of a house, and it is the part you cannot fix later.

That is why our engineer checks steel spacing, concrete mix and curing before every pour, and why we use the cement, steel and bricks named in your BOQ, not cheaper substitutes.

Steel reinforcement mesh before a roof slab pour in Islamabad

What our grey structure package includes

  • Excavation, soil compaction and anti-termite treatment
  • Foundation, plinth beam and DPC (damp proof course)
  • RCC columns, beams and roof slabs to the approved structural drawings
  • Brick masonry for all walls, with first-class bricks
  • Internal and external plaster
  • Electrical conduits, boxes and earthing pits
  • Water supply, drainage and gas lines inside the walls
  • Roof insulation and waterproofing
  • Stair structure, chajjas and boundary to plinth level

What it does not include

  • Tiles, marble and flooring
  • Doors, windows and woodwork
  • Paint, false ceilings and fixtures
  • Bathroom and kitchen fittings
  • Map approval fees paid to the authority

Want everything done? Our turnkey construction package covers grey structure and finishing under one contract.

Grey structure rate in Islamabad and Rawalpindi, 2026

Our grey structure rate is PKR 2,800 to 3,900 per sq ft of covered area, with material and labour. Where you land in that range depends on these four things:

  • Design: cantilevers, double heights and large spans need more steel and concrete
  • Basement: excavation, retaining walls and waterproofing add cost
  • Materials: cement and steel brand, brick class and concrete grade
  • Site: soil type, access for machinery and the society you build in
Plot sizeTypical covered areaGrey structure cost
5 marla2,250 sq ftPKR 63 lakh to 88 lakh
10 marla4,000 sq ftPKR 1.12 to 1.56 crore
1 kanal6,500 sq ftPKR 1.82 to 2.54 crore

Double-storey, without basement. Your written BOQ gives the exact figure. See the full construction cost guide.

Our process

How we build your grey structure

  1. Site visit and soil check

    We check the plot, levels and soil before we price anything.

  2. Structural drawings

    Our engineer designs the frame for Islamabad’s seismic zone and your soil.

  3. BOQ and contract

    You get quantities, brands and a stage-wise payment schedule in writing.

  4. Foundation and frame

    Excavation, footings, columns and slabs, with checks before every pour.

  5. Walls and services

    Brickwork, conduits and plumbing lines laid to the drawings.

  6. Plaster and handover

    Plaster, curing, waterproofing and a grey structure handover report.

Questions people ask

What is the grey structure rate per sq ft in Islamabad in 2026?

Our rate is PKR 2,800 to 3,900 per sq ft of covered area, including material and labour. Simple double-storey designs sit near the lower end; basements, large spans and cantilevers push it up.

What is included in grey structure construction?

Excavation, foundation, DPC, RCC columns, beams and slabs, brick walls, plaster, electrical conduits, plumbing and gas lines inside the walls, and roof waterproofing.

How long does a grey structure take?

About 3 to 4 months for 5 marla, 4 to 5 months for 10 marla and 5 to 7 months for 1 kanal, from approved drawings, if payments follow the schedule.

Is grey structure cheaper with my own material?

Labour-only contracts look cheaper, but the owner then carries the risk of wastage and material quality. We price material and labour together so one party is responsible for the result.

Can you finish the house later?

Yes. Many owners build the grey structure first and finish later. We can take on the finishing whenever you are ready, under our turnkey package.

Planning to build in Islamabad or Rawalpindi?

Send us your plot size and location. Our engineer visits the site free of charge and gives you a written BOQ, so you know the cost before anything starts.

Chat with an engineer