How we build: BOQ, payments, inspections and warranty

A written system on every project: BOQ before work starts, stage-wise payments, engineer checks before each pour, weekly updates and a one-year warranty.

Get my free estimateWhatsApp +92 331 8834468

In short

Every Premium Constructions project follows the same written system: a free site visit, a BOQ with quantities and brands, a contract with stage-wise payments, engineer inspections before each pour, weekly photo updates and a one-year warranty after handover. This page explains each step, so you know exactly what to expect.

1. The BOQ: your cost before we start

A BOQ (bill of quantities) lists every item in your house with its quantity, brand and rate: bags of cement, tons of steel, number of bricks, square feet of tiles, every fitting. It is the single most important document in a build, because it fixes what you are paying for.

  • Quantities measured from your drawings
  • Brands and grades named, not “equivalent”
  • Allowances shown for items you choose later
  • Exclusions written down, so nothing is assumed

2. Stage-wise payments

You never pay a large advance for work that has not been done. Payments are linked to stages you can see on site.

StageWhen it is due
MobilisationOn signing, to start excavation and order materials
Foundation and plinthWhen the plinth beam is complete
Ground floor slabAfter the slab is poured and cured
First floor slabAfter the slab is poured and cured
Brickwork and plasterWhen walls and plaster are complete
Finishing stagesFlooring, woodwork, electrical and paint, in agreed steps
HandoverAfter the snag list is closed

The exact split is agreed in your contract.

3. Engineer inspections

Our chief engineer, Usama Javaid, or a site engineer from his team checks the work at each critical point. Nothing is covered up until it is checked.

  • Excavation levels and soil before foundations
  • Steel size, spacing and cover before every pour
  • Formwork, levels and concrete mix during pours
  • Curing after pours
  • Brickwork alignment and wall joints
  • Electrical and plumbing before plaster
  • Waterproofing before tiles

4. Weekly updates

Every week you get photos and video of your site on WhatsApp, a short note on what was done, and what happens next. Owners abroad tell us this is the part that lets them sleep at night.

5. Handover and one-year warranty

Before handover we walk the house with you and list every snag, from a misaligned tile to a sticky door. We fix the list, then hand over the keys. For one year after handover, we repair any defect in the work we built at no cost.

Questions about our process

What is a BOQ in construction?

A bill of quantities lists every material and work item with its quantity, brand and rate. It fixes the cost and specification before construction starts.

Do I have to pay a large advance?

No. After a mobilisation payment, every payment is linked to a stage you can see on site, such as the plinth, slabs or plaster.

Who inspects the work?

Our chief engineer, Usama Javaid, and his site engineers inspect at every critical stage, especially before concrete pours.

What happens if I want changes during construction?

Every change is priced in writing before it is done, and added to the BOQ once you approve it.

What does the one-year warranty cover?

Any defect in the work we built that appears within a year of handover, repaired at no cost.

Planning to build in Islamabad or Rawalpindi?

Send us your plot size and location. Our engineer visits the site free of charge and gives you a written BOQ, so you know the cost before anything starts.