House construction cost in Islamabad and Rawalpindi, 2026
Grey structure costs PKR 2,800 to 3,900 per sq ft and turnkey PKR 6,000 to 15,000+ in 2026. Use the calculator for your plot, or see costs by plot size below.
Get my free estimateWhatsApp +92 331 8834468
- Written BOQ
- Engineer on site
- 1-year warranty
In short
Building a house in Islamabad or Rawalpindi in 2026 costs PKR 2,800 to 3,900 per sq ft for grey structure and PKR 6,000 to 15,000+ per sq ft for a complete turnkey house. A 10 marla double-storey house of about 4,000 sq ft costs PKR 1.12 to 1.56 crore in grey structure, or PKR 2.4 to 4.6 crore finished to a standard or premium level. These are our own rates as a builder, updated for 2026.
Construction rate per sq ft, 2026
| Package | Rate per sq ft | What it covers |
|---|---|---|
| Grey structure | PKR 2,800 to 3,900 | RCC frame, brickwork, roof slabs, plaster, conduits and plumbing lines |
| Turnkey, standard finish | PKR 6,000 to 8,500 | Grey structure plus local tiles, fittings, paint and woodwork |
| Turnkey, premium finish | PKR 8,500 to 11,500 | Imported tiles and sanitary, solid wood doors, false ceilings |
| Turnkey, A category | PKR 11,500 to 15,000+ | Designer finishes, stone, smart home, landscape |
Rates are per square foot of covered area, including material and labour.
Cost by plot size
Covered area is the total built floor area across all storeys. The figures below assume a typical double-storey house without a basement.
| Plot size | Covered area | Grey structure | Turnkey, standard | Turnkey, premium |
|---|---|---|---|---|
| 5 marla | 2,250 sq ft | PKR 63 to 88 lakh | PKR 1.35 to 1.91 crore | PKR 1.91 to 2.59 crore |
| 7 marla | 2,800 sq ft | PKR 78 lakh to 1.09 crore | PKR 1.68 to 2.38 crore | PKR 2.38 to 3.22 crore |
| 10 marla | 4,000 sq ft | PKR 1.12 to 1.56 crore | PKR 2.4 to 3.4 crore | PKR 3.4 to 4.6 crore |
| 1 kanal | 6,500 sq ft | PKR 1.82 to 2.54 crore | PKR 3.9 to 5.53 crore | PKR 5.53 to 7.48 crore |
| 2 kanal | 11,000 sq ft | PKR 3.08 to 4.29 crore | PKR 6.6 to 9.35 crore | PKR 9.35 to 12.65 crore |
A category finishes go up to PKR 15,000+ per sq ft. Use the calculator above for your own covered area.
Where the money goes
On a typical turnkey house, the grey structure is around 40 to 45 percent of the total cost and finishing is the rest. Within the grey structure, steel and cement are the biggest items, followed by bricks and labour. Finishing costs swing the most, because tiles, wood, sanitary fittings and lighting vary hugely by brand.
- Structure: steel, cement, crush, sand, bricks and labour
- Services: electrical wiring, plumbing, gas and drainage
- Finishes: flooring, doors and windows, kitchen, bathrooms, paint, ceilings
- External: boundary wall, gate, car porch and landscaping
What changes your cost
- Basement: adds excavation, retaining walls and waterproofing
- Design: double heights, cantilevers and large glass add steel and labour
- Finishing level: local, imported or designer brands
- Location: access, soil and society rules differ across DHA, Bahria and the sectors
- Material prices: steel and cement rates move during the year
- Timeline: stop-start projects cost more than continuous ones
Costs not included in per sq ft rates
- Map approval and authority fees (CDA, RDA, DHA, Bahria Town)
- Utility connections: electricity, gas and water meters
- Boundary wall and main gate on large plots
- Basement and swimming pool
- Solar system, generators and smart home
- Furniture, curtains and appliances
Get the exact figure for your plot: we give a written BOQ after a free site visit. Request your estimate.
Construction cost questions
What is the construction cost per sq ft in Islamabad in 2026?
PKR 2,800 to 3,900 per sq ft for grey structure, and PKR 6,000 to 15,000+ per sq ft for a complete turnkey house, depending on finishing.
How much does a 5 marla house cost to build in Islamabad?
About PKR 63 to 88 lakh for grey structure and PKR 1.35 to 2.59 crore turnkey, for a double-storey house of around 2,250 sq ft.
How much does a 1 kanal house cost to build?
About PKR 1.82 to 2.54 crore for grey structure and PKR 3.9 to 7.48 crore turnkey with standard to premium finishes, for around 6,500 sq ft without basement.
Is construction cheaper in Rawalpindi than Islamabad?
Material and labour rates are similar. Differences come from approvals, access and the society's rules more than the city itself.
Why do quotes from different builders vary so much?
Quotes often leave out items or use cheaper brands. Ask for a BOQ that names brands and quantities, then compare line by line.
Does the rate include map approval?
No. Authority fees are paid at actual cost. Our design and drawing work is included in turnkey contracts.
Planning to build in Islamabad or Rawalpindi?